Parrot Reporters
No Result
View All Result
  • Home
  • Top Stories
  • News
  • Politics
  • Business
  • Economy
  • World News
  • Diaspora
  • Other Features
    • Crime
    • Entertainment
    • Tourism
    • Interviews
    • Editorials
    • Opinion
Parrot Reporters

See How Much Gurara Hydro Power Project II Will Cost

Parrot Reporters by Parrot Reporters
May 16, 2019
0
Buhari Signs Extradition Treaty With UAE
Share on FacebookShare on TwitterShare on Whatsapp

The Federal Executive Council (FEC) has approved the financing of the Gurara Hydro Power Project II by the Forum on China-Africa Cooperation (FOCAC) to the tune of one billion dollars.

The Minister of Water Resources, Alhaji Suleiman Adamu disclosed this when he briefed State House correspondents at the end of the council’s meeting, which was presided over by President Muhammadu Buhari.

According to him, the Gurara II power project has the potential of 360 Megawatts of electricity.

The Minister said “On the need to explore the potentials of the Gurara II Hydro Power Project, which has the potential of 360 Megawatts of electricity, Council approved for us to take this project to FOCAC for possible financing by the China Exim bank at the cost of about a billion dollars.

He said the Council also approved a revised cost of the project to N5.7 billion for the completion of Nkari Dam in Akwa Ibom State.

He said: “On the need to complete Nkari dam in Akwa Ibom State, we sought approval for a revised estimated total cost of the project and this was approved at about N5.7 billion.’’

He further disclosed that the Council approved the appointment of a consultant for the supervision of Gari Irrigation Project in Kano and Jigawa States, which hitherto abandoned for 17 years.

He also said Cabinet gave approval for the Rise Estimated Total Cost for completion of Ile-Ife dam in Osun State at the cost of N10.4 billion.

“We got approval for the Rise Estimated Total Cost (RETC) for the completion of Ile-Ife dam in Osun State.

“This is a dam project that was started in 2004 and abandoned and we are looking forward to completing it.

“So, Council has approved the RETC in the sum of about N10.4 billion so we hope that with the approval, the contractor will resume on site and work will be continued, with the hope that it will be completed in 24 months,” the minister stated.

More News...

LASPPPA Seals Over 45 Buildings in Lagos Over Planning Violations

Breaking Barriers: Women Leading Change in the Casino Industry

Power Minister Attributes Electricity Disruptions to Gas Shortages, Maintenance Challenges

Unlocking the Secrets: Why Online Casinos are Taking the World by Storm

Court Nullifies David Mark-Led ADC Leadership, Atiku’s 2027 Candidacy

The Art of Slots: How Themes Draw Diverse Casino Crowds

NDC Slams Tinubu Over Fresh $7.7bn Loan Request, Urges Nigerians to Vote in 2027

Flamingos Beat Brazil 3-1 to Reach First-Ever U-17 Women’s World Cup Final

About Us

Parrot Reporters is an independent and non-partisan news platform with special focus on Nigerians in Diaspora cum news within and outside the shore of Nigeria.


Our aim is to celebrate the exploits of Nigerians in diaspora particularly in Southern Africa and other parts of the world.

Categories

  • Business
  • Comic
  • Cover Stories
  • Crime
  • Economy
  • Editorials
  • Entertainment
  • Health
  • Interviews
  • Nigerians In Diaspora
  • Opinion
  • Other News
  • Politics
  • Sports
  • Tourism
  • Videos
  • World News

Follow Us

COPYRIGHT © Parrot Reporters
No Result
View All Result
  • Browse
    • Sports

© Parrot Reporters